Energy

EPC, Gas Safety and EICR: A Landlord Checklist

An EPC, gas safety record and EICR do different jobs. Use this England-focused checklist to organise marketing, tenant handover and renewal dates.

British landlord with an energy assessor and safety engineer checking a boiler, consumer unit, radiator and socket in a terraced rental

An EPC, gas safety record and EICR do different jobs. Use this England-focused checklist to organise marketing, tenant handover and renewal dates.

An Energy Performance Certificate, a landlord gas safety record and an Electrical Installation Condition Report are three separate records. The EPC describes energy performance. The gas record confirms the annual safety check of gas appliances and flues supplied for tenants. The EICR records the condition of the fixed electrical installation. One does not replace another.

For a typical residential letting in England, the practical job is to check the right document at the right stage: before marketing, before the tenant occupies the property, after an inspection and before each expiry date. This checklist brings those dates together without turning a safety inspection into an EPC claim. Different rules and guidance apply in Scotland, Wales and Northern Ireland, and unusual tenancy arrangements may need property-specific advice.

The quick answer: three documents, three purposes

Treat the records as separate workstreams in the same property file. That makes it easier to brief a letting agent, avoid last-minute access problems and see where an energy assessment can create commercial value rather than simply satisfy a diary reminder.

  • EPC: shows the property’s energy-efficiency rating and recommendations. A valid certificate is normally reusable for up to 10 years unless a newer EPC is produced. It is not a gas, electrical or general safety certificate.
  • Gas safety record: records the annual check of relevant landlord-provided gas appliances and flues by a Gas Safe registered engineer. It does not measure energy performance.
  • EICR: records the inspection and testing of the fixed electrical installation, including wiring, sockets, light fittings and the consumer unit. The report sets the next inspection date and identifies required work.

The government’s landlord responsibilities overview lists energy certificates, gas safety and electrical safety as separate landlord responsibilities. Keep a master compliance diary, but retain each original record and its evidence trail.

Before marketing: check the EPC first

For homes in England and Wales, the official EPC marketing and letting guide says that, if no valid EPC exists, one must be commissioned before the building is put on the market. Commercial advertisements must show the energy rating where it is available, and the valid EPC must be given free of charge to the person who becomes the tenant.

Check the address, issue date and rating on the official register rather than relying on an old PDF saved by a previous agent. A certificate remains valid for 10 years or until a newer EPC is produced for the same building. A new tenancy does not automatically require a new EPC where a valid one already exists, although a property change, evidence gap or planned upgrade may justify reassessment.

If work is planned, use the guide to when landlords need a new EPC after improvements. Lodging too early can leave completed measures outside the certificate; waiting too long can hold up marketing.

Before move-in: issue the current safety records

For gas, the Health and Safety Executive’s landlord gas safety guidance requires a check at least every 12 months by a Gas Safe registered engineer for covered appliances and flues. Give a new tenant the current gas safety record before they move in. Existing tenants must receive a copy within 28 days of the check, and the landlord must keep the record for two years.

For electrics, the current electrical safety guidance for rented homes in England says the fixed installation must be inspected and tested by a qualified person at least every five years. The report may set an earlier next-inspection date. Give a new tenant the latest report before they occupy the property, an existing tenant a copy within 28 days of the inspection, and a prospective tenant a copy within 28 days of a request.

Do not let the five-year headline override the date written in the EICR. Likewise, do not assume a newly issued tenancy creates a fresh five-year period. The controlling evidence is the current report, its outcome and its next-inspection date.

What to do when a safety check finds a problem

A record is not a substitute for action. HSE says landlords must take prompt action to correct defects shown by the gas safety check. Where an appliance may be dangerous or unsafe, it should not be used until the defect has been remedied. The gas safety check guidance also confirms that an empty property needs an up-to-date record ready for the new tenant before move-in.

For an EICR, C1 means danger is present, C2 means potentially dangerous and FI means further investigation is required without delay. Those outcomes require action. The government guidance says necessary remedial or investigative work must be completed within 28 days, or sooner where the report specifies a shorter period. A C3 is an improvement recommendation and does not by itself make the report unsatisfactory.

Keep the original report, invoices and the qualified person’s written confirmation of completed work. Record when the tenant received the documents. If access is difficult, keep a clear audit trail of appointment offers and correspondence rather than allowing the deadline to pass silently.

How gas safety checks and EICRs affect the EPC rating

No. Completing a gas safety check or EICR does not add EPC points by itself. The EPC methodology uses the building’s fabric and services, such as heating, insulation, glazing, lighting and ventilation. The government’s EPC guide is explicit that the energy assessment does not confirm the safety or maintenance condition of those services.

A repaired or replaced component may affect the data used in a later assessment, but the assessor needs accepted evidence and the relevant feature must be represented correctly. The same distinction is explained in our guide to whether a boiler service improves an EPC rating. Safety comes first; any energy-rating benefit is a separate assessment question.

Add EPC D-to-C planning without muddling the files

Current domestic Minimum Energy Efficiency Standard guidance for England and Wales says covered private rentals must currently reach at least EPC E unless a valid exemption applies. A D-rated property can normally be let under the present floor, but the confirmed policy direction towards a higher 2030 standard makes early assessment commercially useful. Planned future rules still depend on legislation and implementation detail.

When the EPC is D, review the score and evidence gaps separately from the gas and electrical diary. The evidence-first D-to-C plan shows how documentary evidence, proportionate measures and specialist testing can be assessed before major work. Testing is evidence; it does not change a lodged EPC by itself. A qualified assessment must use accepted evidence and lodge the new certificate.

A practical landlord handover checklist

Use this sequence for a typical residential letting in England, then adjust it for the tenancy, property and findings recorded by each qualified professional.

  1. Before marketing: verify the property address and valid EPC on the register; commission one if required; record the rating in the advert; check whether current MEES applies.
  2. Before move-in: give the tenant the valid EPC, the current gas safety record where gas duties apply, and the latest satisfactory EICR or the report plus evidence of completed required work.
  3. After each check: act on defects, obtain written completion evidence, send required copies within the stated deadlines, and record the delivery date.
  4. Set renewals from the evidence: gas every 12 months, EICR by the report date and at least every five years, and EPC by its expiry date unless a newer one is lodged first.
  5. For a D-rated rental: create a separate assessment workstream for the score, assumptions, property evidence and proportionate route to C. Do not delay safety work while considering energy improvements.

Frequently asked questions

These answers summarise the practical document workflow. Check the live official guidance where a tenancy, appliance or building falls outside the usual residential position.

Does a landlord need an EPC, gas safety certificate and EICR?

A typical residential landlord in England may need all three, but each has its own scope and exceptions. The EPC applies to the energy performance and marketing or letting trigger. Gas duties depend on the appliances, flues and tenancy circumstances. England’s electrical rules cover fixed installations in rented homes subject to stated exclusions. Check the property and tenancy rather than using one document as proof of another.

How often must the three records be renewed?

Gas safety checks are annual. Fixed electrical installations must be inspected at least every five years, or sooner if the EICR sets an earlier date. An EPC is normally valid for 10 years or until a newer EPC is produced. Work from the actual dates on the records and leave time for access and any required repairs.

Does an EICR replace an EPC?

No. An EICR considers the safety and condition of the fixed electrical installation. An EPC rates energy performance using the building’s fabric and services. Both may examine features in the same home, but the reports answer different questions and are produced under different requirements.

Can the gas check and EICR be completed on the same visit?

Appointments can be coordinated, but each task must be completed by a person qualified for that work and must produce the correct separate record. Confirm competence, scope and access before booking. Coordinating access can reduce disruption, but it does not merge the legal duties or inspection outcomes.

Turn the EPC into a property decision

The compliance file should tell you what is due; the EPC assessment should tell you what is credible. Once the safety records are in hand, use the current EPC, property evidence and planned work to decide whether reassessment now creates value or whether another step should come first.

Start your free EPC assessment to review a D-rated rental, its evidence gaps and the lowest-cost credible route towards C before committing to major work.

Turn guidance into a property decision

Specialist EPC assessment

Understand EPC evidence, testing and the route to a reliable certificate.

Read the decision guideStart a free assessment