Grants

Can Landlords Get the Boiler Upgrade Scheme Grant? A 2026 Checklist

Private landlords can use the Boiler Upgrade Scheme for eligible rentals in England and Wales. Check the grant, property, tenant and EPC decisions first.

British landlord and MCS heat-pump surveyor measure a rear brick wall at an English semi-detached rental home

Private landlords can use the Boiler Upgrade Scheme for eligible rentals in England and Wales. Check the grant, property, tenant and EPC decisions first.

Yes. A private landlord can benefit from the Boiler Upgrade Scheme when an eligible rental property in England or Wales is moving to a qualifying low-carbon heating system. The grant is not restricted to owner-occupiers, and tenant income is not the usual eligibility test. The property, existing heating, proposed system, ownership and application evidence still have to meet the scheme rules.

For a landlord with a D-rated rental, that answer does not automatically make a heat pump the right first move. The commercial question is whether heating replacement is the best route for this property, whether the grant leaves an affordable contribution, and whether a lower-cost evidence or small-measure route could reach the EPC target first. BUS reduces an eligible installation price; it does not guarantee a free system or EPC C.

Start your free EPC assessment to compare the current certificate, credible evidence, proportionate measures and a funded heating route before agreeing an installation.

The short answer: BUS can cover an eligible rental property

Ofgem’s Boiler Upgrade Scheme guidance for property owners is written for owners who want to use the scheme and specifically tells landlords to inform any tenant about the installation. An MCS-certified installer checks the detailed eligibility, submits the application and applies the grant as an upfront deduction. Ofgem contacts the property owner directly to confirm consent and identity; neither the installer nor Cucumber Eco makes the final scheme decision.

The live government grant-value page checked on 20 November 2026 lists £7,500 for an air-to-water heat pump or ground-source heat pump, £2,500 for an air-to-air heat pump and £5,000 for a biomass boiler. Until 31 March 2027, an eligible off-gas-grid property replacing oil or LPG with an air-to-water or ground-source heat pump can receive an additional £1,500, taking that grant to £9,000. The exact technology and temporary uplift conditions matter.

What makes a landlord’s property eligible?

At a high level, the property must be in England or Wales and the proposed installation must use an eligible technology. Ofgem’s property-owner eligibility page says the scheme is open to residential and non-residential properties, while air-to-air heat pumps are limited to residential buildings. The installer must check the property type, location, existing heating, proposed system and technical standards before applying.

The existing fossil-fuel system must be fully replaced. A landlord cannot keep a gas or oil boiler alongside a BUS-funded heat pump as a hybrid arrangement. Most new-build properties, social housing and a property that has already received public support for the same heat pump or biomass installation are normally excluded. The scheme also requires the property owner to become the legal owner of the new system, so some third-party ownership or finance structures do not qualify.

A grant is not pre-approved because a landlord, property or installer appears to fit those headlines. Ofgem confirms eligibility only after the installer submits the required information and the owner completes consent and identity verification. The owner should expect to provide accurate ownership and property details, confirm the heating being replaced and keep the quote, invoice and proof of payment.

Do you need an EPC before a BUS application?

A valid EPC is useful but is not an absolute gateway in every application under the current rules. If one exists, the installer includes its reference. If there is no valid EPC, Ofgem’s November 2026 guidance says the installer may use alternative evidence such as a recent utility bill or fuel receipt, photographs of the existing heating system and an expired EPC where available. A recently obtained EPC and its site notes should be retained because Ofgem may ask for them during an audit.

That is separate from the landlord’s rating decision. Review the evidence-led D-to-C plan and the guide to how a heat pump can affect an EPC before treating the grant as the solution. The rating effect depends on the dwelling, system design and calculation inputs. Installing a heat pump does not itself update the register; a qualified assessment must use the completed installation evidence and lodge a new EPC.

Tenant and access steps landlords should plan

Ofgem requires a landlord to confirm that the tenant has been informed about the installation. In practice, the owner should plan survey access, installation dates, loss of heating or hot water, internal pipework, radiator or cylinder work, commissioning and any later audit visit. The installer needs an accurate picture of how the home is occupied and heated; a design based on assumptions can create cost and comfort problems even if the grant application succeeds.

BUS guidance does not replace the tenancy agreement, statutory access rules, planning, freeholder consent or building-specific permissions. A leasehold flat may also need decisions about external equipment, common parts, electrical capacity and where a cylinder can go. Those issues should be resolved before a landlord relies on the grant in a budget or promises an installation date to the tenant.

Can a portfolio landlord claim for more than one rental?

The government states that there is one BUS grant per property, rather than one grant per landlord. That does not mean every property in a portfolio will qualify. Each address needs its own eligible installation, evidence, quote, installer application, owner consent and Ofgem decision. A portfolio plan should rank properties by boiler condition, heat loss, tenant disruption, system suitability, electrical work, likely owner contribution and the EPC outcome being pursued.

The portfolio triage guide helps owners sequence D-rated homes. If the real choice is between BUS and a tenant-linked council route, use the separate heating-grants comparison for landlords. This article owns the landlord-specific BUS eligibility and preparation question, not the wider funding comparison.

How BUS fits the planned 2030 landlord standard

Current domestic MEES landlord guidance still sets EPC E as the minimum for covered private rentals in England and Wales, subject to exemptions. A D-rated rental is above that present floor. The government has separately confirmed a higher standard for 1 October 2030, with implementing legislation and detailed Home Energy Model rules still required. A landlord should not present today’s grant decision as proof of future compliance.

The government response on the higher private-rented standard says BUS funding will not count towards the planned £10,000 MEES cost cap, although a landlord’s own eligible contribution can count where the final framework permits. That makes BUS potentially valuable, but not automatically the cheapest compliance route. The property may still need fabric work, controls, emitter changes or accepted evidence, and final product-level effects under the future EPC method are not yet fixed.

A seven-step landlord BUS checklist

1. Confirm the property is in England or Wales, identify the existing heating and check whether any previous public funding supported a heat pump or biomass system at the address. 2. Review the current EPC and decide whether heating replacement is actually needed for the target outcome. 3. Arrange a property-specific design and itemised quote from an MCS-certified installer. 4. Check that the quote shows the grant deduction and the landlord’s remaining contribution. 5. Inform the tenant and plan access, disruption and any permissions. 6. Respond to Ofgem’s consent and identity request within the stated period. 7. Keep the EPC, site notes, heating photographs, quote, invoice, payment evidence and MCS certificate for any audit and later assessment.

Use the MCS installer-check guide before accepting a quote. A grant voucher is not a substitute for a suitable heat-loss calculation, competent design, clear consumer protection or a plan for the rental’s EPC and tenant needs.

Primary sources checked

This guide was checked on 20 November 2026 against Ofgem Boiler Upgrade Scheme Property Owner Guidance version 5.2, the live Ofgem property-owner page, the government grant-value and application pages, current domestic MEES guidance and the government response on the planned higher private-rented standard. Scheme values, deadlines and eligibility can change, so confirm the current position before committing to work.

Frequently asked questions

Can a landlord get a £7,500 Boiler Upgrade Scheme grant?

Yes, when the rental, existing heating and proposed air-to-water or ground-source heat pump meet the scheme rules. The MCS-certified installer applies, and Ofgem confirms eligibility. The grant is deducted from the installation price rather than paid to the landlord as cash.

Does the tenant apply for BUS?

No. The installer applies on behalf of the property owner, and Ofgem contacts the owner to confirm consent and identity. The landlord must confirm that the tenant has been informed about the installation and should plan lawful access and disruption with them.

Can a landlord get BUS for several rental properties?

The government says one grant is available per property. Each rental must qualify separately and needs its own installer application, evidence, owner consent and Ofgem decision. Do not assume that approval at one address proves eligibility at another.

Does a rental need a valid EPC for BUS?

Not in every case. The installer includes a valid EPC reference when one exists, but current Ofgem guidance allows alternative evidence where there is no valid EPC. The installer is responsible for supplying the required eligibility evidence.

Will a BUS-funded heat pump guarantee EPC C?

No. Grant eligibility and EPC performance are different decisions. Model the proposed system and the whole property before committing, then arrange a qualified assessment if the completed installation needs to be reflected in a newly lodged EPC.

Can the landlord keep the gas boiler as backup?

No, not as part of an eligible BUS-funded hybrid system. Current Ofgem guidance says the existing fossil-fuel heating system must be fully replaced and cannot remain alongside the funded installation.

Turn guidance into a property decision

Landlord EPC planning

Plan rental-property evidence, compliance and improvement decisions.

Read the decision guideStart a free assessment